
16
Installing the XS 2B double control unit
The control unit is battery-powered and communicates wirelessly with the motor
control unit. No connection cables are therefore required.
The control unit must only be installed and used in dry,
interior spaces. Relative air humidity must not exceed 80%.
Avoid condensation.
Rear view and drill sketch
All values in mm, may vary due to technical requirements.
Inserting the batteries
The battery compartment is located inside the housing.
Open the control unit by releasing the catch
on the bottom of the housing. To do this,
press a screwdriver directly into the slot.
Masse en mm
Dimensions in mm