![Ecolab EcoAdd Operating Instructions Manual Download Page 41](http://html1.mh-extra.com/html/ecolab/ecoadd/ecoadd_operating-instructions-manual_2354521041.webp)
6.2.2
Wall mounting
Fig. 10: Preparations for wall mounting
1.
Turn mounting plate over.
2.
For wall mounting, fastening elements with the code 2 (Fig. 10, pos. 3)
and with code 1 (Fig. 10, pos. 2) are used.
Insert fastening elements (labelled:
1
, Fig. 10, pos. 2) from behind into the two upper
openings marked "wall" (= wall mounting)and engage into position.
3.
Insert fastening elements (labelled:
2
, Fig. 10, pos. 3 ) from behind into the two lower
openings marked "wall" and engage into position.
4.
Turn mounting plate over again and hold it against the required mounting position.
5.
Using mounting plate as a template, mark required boreholes with a sharp pencil.
6.
Make the holes.
7.
Fasten the mounting plate securely to the wall.
The hooks of the fastening elements must point upwards.
8.
Place pump onto the hooks on the mounting plate from above.
9.
Slide pump downwards onto the mounting plate until it engages with an audible click.
10.
To remove the pump from the mounting plate, push down on the fixing
11.
Attach the connecting lines (hydraulic and electric):
Chapter 6.3.1 ‘Hydraulic installation’ on page 43
Chapter 6.3.4 ‘Electrical installation’ on page 51
Assembly, installation, modification and upgrades
41
Rev. 2-05.2018