![Ecolab EcoAdd Operating Instructions Manual Download Page 107](http://html1.mh-extra.com/html/ecolab/ecoadd/ecoadd_operating-instructions-manual_2354521107.webp)
7.9.12.3 [Select Batch] - [Initial concentration]
Fig. 66: Charge - [Initial preparation]
1.
[Main menu]
:
Chapter 7.6 ‘Main menu’ on page 66
2.
[Configuration menu]
Chapter 7.9 ‘Overview - Configuration’ on page 83
3.
Use the scrollbar to scroll to the
[Select Batch]
menu option.
4.
[Select Batch]
- select.
ð
Screen switches to the selection level
[Select Batch]
5.
‘Preparation concentration’
.
ð
The
‘preparation concentration’
option field is marked.
6.
[ Press the Next button]
.
ð
Screen change for setting:
‘Preparation concentration’
/
‘water quantity’
.
7.
Enter the quantity in litres using the scrollbar.
8.
[ Press the Next button]
.
ð
Screen change for setting:
‘Preparation concentration’
/
‘concentration’
.
9.
Enter the concentration in percent (%) using the scrollbar.
10. ‘Select the concentration in the decimal point position’
.
11.
Enter the concentration in percent (%) (after the decimal point) using the scrollbar.
12. [ Press the Next button]
.
ð
Screen change for setting:
‘Preparation concentration’
/
‘metering time’
.
13.
Enter the metering time in minutes using the scrollbar.
14.
Press the button.
ð
The setting is saved, and the screen switches back to the charge overview.
15.
Press the button to return to the
[Configuration menu]
.
16.
Pressing the button returns to the
[Main menu]
.
17.
Pressing the button returns to the
[Operating display]
.
Control / software
107
Rev. 2-05.2018