![Ecolab EcoAdd Operating Instructions Manual Download Page 111](http://html1.mh-extra.com/html/ecolab/ecoadd/ecoadd_operating-instructions-manual_2354521111.webp)
7.9.14.1.1 Metering monitoring
Fig. 69: Configuration: Metering monitoring
Factory setting: without metering monitor
Selection of the [Metering monitoring]:
1.
[Main menu]
:
Chapter 7.6 ‘Main menu’ on page 66
2.
[Configuration menu]
Chapter 7.9 ‘Overview - Configuration’ on page 83
3.
Use the scrollbar to scroll to the [Oval gear meter] menu option.
4.
[Oval gear meter]
- select
ð
Screen switches to the
[Oval gear meter]
.
5.
[Metering monitoring]
- select
ð
Screen switches to the
[Metering monitoring]
.
6.
If required, select the selection box
‘with metering monitoring’
.
ð
The selection box
‘with metering monitoring’
is marked.
7.
[Press the Next button]
.
ð
Screen change for setting:
‘Metering monitoring’
/
‘Stop pump’
/
‘Quantity’
.
8.
If required, select the
‘Stop pump’
selection box.
ð
The
‘Stop pump’
selection box is marked.
9.
[ Press the Next button]
.
ð
Screen change for setting:
‘Metering monitoring’
/
‘Monitoring time’
.
10.
Enter the minutes before the decimal point with the scrollbar.
11.
Select the seconds after the decimal point.
12.
Enter the seconds with the scrollbar.
13. [ Press the Next button]
.
ð
Screen change for setting:
‘Metering monitoring’
/
‘Deviation’
.
14.
Enter the deviation in percent (%) using the scrollbar.
15.
Press the button.
ð
The setting is saved, and the screen switches back to the configuration overview.
16.
Pressing the button returns to the
[Main menu]
.
17.
Pressing the button returns to the
[Operating display]
.
Control / software
111
Rev. 2-05.2018