![Ecolab EcoAdd Operating Instructions Manual Download Page 118](http://html1.mh-extra.com/html/ecolab/ecoadd/ecoadd_operating-instructions-manual_2354521118.webp)
7.10
Calibration
The metering pump is calibrated at the site to the flow rate of the
corresponding pump type at nominal pressure.
The corresponding flow rate and the nominal pressure is given in the technical
data in the operating manual.
We recommend performing another calibration on the pump again after
installation and thus to adjust it to the on-site operating and ambient
conditions. This corrects any deviations in the performance data
(e.g. due to cable cross-sections, back-pressure, temperature).
Fig. 76: Calibration
Control / software
118
Rev. 2-05.2018