E93.1801EN171 HWB installation manual
58
Alternate vertical terminations with multiple water heaters.
Note: keep the terminals at min. 12" above grade or snow line. Provide vent and air intake with bird screen.
Concentric Vertical Termination.
Do Not Install U-Bend or elbow on concentric termination
Minimum clearance
above snow level
(18” for Canada)
Maximum 24” above
roof or snow level.
Summary of Contents for HWB-299
Page 2: ......
Page 7: ...E93 1801EN171 HWB installation manual 7 1 SAFETY GUIDELINES...
Page 8: ...E93 1801EN171 HWB installation manual 8 CONSIGNES DE S CURIT...
Page 65: ...E93 1801EN171 HWB installation manual 65 Ladder Logic Diagram...
Page 66: ...E93 1801EN171 HWB installation manual 66 Electrical schematics...
Page 67: ...E93 1801EN171 HWB installation manual 67...
Page 119: ...E93 1801EN171 HWB installation manual 119 22 SPARE PARTS...
Page 120: ...E93 1801EN171 HWB installation manual 120 68 68 73...
Page 123: ......