9.1.3
W
ATER HEATER RESISTANCE GRAPH
HWB-499
Minimum required pump head.
To prevent calcification of the heat exchanger, the speed of the water needs to be high. The design flow of the
system should be at a delta T of 27 °F (15 °C) at high fire. To calculate the minimum required pump head, take
the resistance of the water heater and add the resistance of the piping and tank to make a good design.
Normally, an extra 6.6 feet of head (2 m.WC) is sufficient to overcome the resistance of the pipe and tank.
Water heater
ΔT = 27 °F (15 °C)
at flow rate
min. required head
for water heater
min. required head for in-
stallation
+ 6.6 feet.WC / +2 m.WC
[gpm]
[m3/h]
[ft.WC]
[m.WC]
[ft.WC]
[m.WC]
HWB-299
19.70
4.47
19.5
5.94
26.1
7.94
HWB-399
26.44
6.01
16.9
5.15
23.5
7.15
HWB-499
31.66
7.19
15.3
4.67
21.9
6.67
0
5
10
15
20
25
30
0
5
10
15
20
25
30
35
40
45
50
pr
es
uur
e dr
op [
ft o
f he
ad]
Flowrate [gallons (US)/minute]
Resistance graph HWB-499
ΔT=20 °F
ΔT=27 °F
Summary of Contents for HWB-299
Page 2: ......
Page 7: ...E93 1801EN171 HWB installation manual 7 1 SAFETY GUIDELINES...
Page 8: ...E93 1801EN171 HWB installation manual 8 CONSIGNES DE S CURIT...
Page 65: ...E93 1801EN171 HWB installation manual 65 Ladder Logic Diagram...
Page 66: ...E93 1801EN171 HWB installation manual 66 Electrical schematics...
Page 67: ...E93 1801EN171 HWB installation manual 67...
Page 119: ...E93 1801EN171 HWB installation manual 119 22 SPARE PARTS...
Page 120: ...E93 1801EN171 HWB installation manual 120 68 68 73...
Page 123: ......