Pin and Terminal Assignments of VS 300
77
Doku-Version 2.05 - Firmware 2.10 - 15. September 2017
6.2
Pin assignments and their function
Power supply
Basic configuration - Function
Terminal No.
230 V AC
N, L
Ground conductor
A PE screw connector (M4 thread) is provided on the rear panel for grounding and shielding use.
Digital inputs
Basic configuration - Function
Terminal No.
Digital Input 1
230 V AC, floating
D11, D12
Digital Input 2
230 V AC, floating
D21, D22
Digital Input 3
230 V AC, floating
D31, D32
Digital Input 4
230 V AC, floating
D41, D42
When a digital input
Fast unload extern OFF
is used for a safety-critical application,
additional measures for the purpose of monitoring must be undertaken.
Relay outputs
(all changeover contacts 230 V AC)
Basic configuration - Function
Terminal No.
S1 - Relay/control stage 1
Stage loaded: 35, 38
35, 36, 38
S2 - Relay/control stage 2
Stage loaded: 45, 48
45, 46, 48
S3 - Relay/control stage 3
Stage loaded: 55, 58
55, 56, 58
S4 - Relay/control stage 4
Stage loaded: 65, 68
65, 66, 68
1st expansion stage - Function
S5 - Relay/control stage 5*
Stage loaded: 75, 78
75, 76, 78
S6 - Relay/control stage 6*
Stage loaded: 85, 88
85, 86, 88
S7 - Relay/control stage 7*
Stage loaded: 95, 98
95, 96, 98
S8 - Relay/control stage 8*
Stage loaded: 105, 108
105, 106, 108
2nd expansion stage - Function
S9 - Relay/control stage 9**
Stage loaded: 115, 118
115, 116, 118
S10 - Relay/control stage 10**
Stage loaded: 125, 128
125, 126, 128
S11 - Relay/control stage 11**
Stage loaded: 135, 138
135, 136, 138
S12 - Relay/control stage 12**
Stage loaded: 145, 148
145, 146, 148
*
From 1st expansion stage
**
From 2nd expansion stage
Summary of Contents for VS 300
Page 8: ...vi Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 18: ...System Design of VS 300 10 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 22: ...Application of VS 300 14 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 160: ...Decommissioning and disposal 152 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 166: ...Alarms and Messages of VS 300 158 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 170: ...162 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...