Function of VS 300
18
Doku-Version 2.05 - Firmware 2.10 - 15. September 2017
Rear of VS 300: Allocation of relay/control
stages
S7 - S8
configured as
alarm relais with
priority 1/
2
5
6
55
4
8
4
6
45
3
5
38
36
68
66
6
5
5
8
96
9
5
88
86
8
5
78
76
7
5
108
106
10
5
98
S
5
S6
S7
S8
S1
S
2
S3
S
4
S
UPPLY
2
30 V
AC
ALAR
M
R
E
LAY
2
30 V
AC
2
8
2
6
25
18
16
1
5
R
E
LAY OUTPUT
S
2
30 V
AC
TEMP. INPUTS
NTC / PT1000
96
9
5
88
86
8
5
78
76
7
5
108
106
10
5
98
Z42
Z41
Z32
Z31
Z22
Z21
Z12
Z11
Z62
Z61
Z52
Z51
136
13
5
1
2
8
1
2
6
1
25
118
116
11
5
1
4
8
1
4
6
1
45
138
5
6
55
4
8
4
6
45
3
5
38
36
68
66
6
5
5
8
L
N
1
4
13
R
elay/control stages:
Basic configuration
First expansion stage
S1 - S3
C
ontrol loop 1
S
4
- S
5
C
ontrol loop
2
S6
R
eserve
S1..S3
S
4
..S
5
S6
C
ontrol loop 1
C
ontrol loop
2
R
eserve
ADDR
ESS
CAN
-B
U
S
1
4
2
3
1
ZNR. 51203 52 530 E2
SWI
TC
H
D
I
G
I
TA
L
2
30 V
AC
A4
1
A42
A5
1
A52
1
2
3
4
D
31
D
3
2
D4
1
D42
D
1
2
D
11
D2
1
D22
A
1
2
A22
A
3
2
A2
1
A
11
A
31
TTY
ANALOG
I
N
|
ANALOG
OUT
L
N
L
N
+
4..20 mA
A41/A51: + 0..10 V
A42/A52:
G
ND
Summary of Contents for VS 300
Page 8: ...vi Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 18: ...System Design of VS 300 10 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 22: ...Application of VS 300 14 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 160: ...Decommissioning and disposal 152 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 166: ...Alarms and Messages of VS 300 158 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 170: ...162 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...