Function of VS 300
16
Doku-Version 2.05 - Firmware 2.10 - 15. September 2017
With a mixed configuration of single-stage and capacity-controlled compressors, the capacity-con
trolled compressors must be connected at the beginning of the relay field assigned to the respective
control loop, followed by the single-stage compressors. Capacity-controlled stages (fans/compres
sors) are not supported with continuous control (speed or combined control). The settings for these
operating modes are therefore:
L
x
=1 and B
x
=0
.
With speed control, base load stages can be assigned to Control Loop 1 or 2 depending on whether
a bypass function to bridge the frequency changer is desired or not (see section 4.5.5 Control Algo
rithm with Speed Control). A minimum of two base load stages must be assigned to the control Loop
with combined control.
The number of relay/control stages required for a control loop is calculated as follows:
No
.
of
relays
CL
x
(
G
x
B
x
)
B
x
L
x
where x = either CL1 or CL2
The relay outputs assigned to Control Loop 1 always start at relay/control stage S1.
The relay outputs assigned to Control Loop 2 start at relay/control stage Sn where
n =
(No. of relays CL1
+ 1)
See section 5 Pin and Terminal Assignments for details of pin assignments.
When setting parameters for system configuration, make sure not to exceed the number of relay/
control stages available:
No. of relays CL1 + No. of relays CL2 + number internal alarm relais
<= Number of VS 300 relay/control stages (4/8/12 depending on expansion stage)
4.1.2
Dispatching of the internal alarm outputs
To the control of alarm signalling equipment (telephone selecting equipment etc..) can up to two relays for mes
sages with priority 1 or 2 be assigned (chapter 7 Parameter list and menu structure). These relays always are at
the end of each stage of development.
Extension
Number of relay/control sta
ges
Extension
Number internal alarm relais
Relais number,
Intended for the alarm signalling equipment
(see chapter 5 Pin and Terminal Assignments of VS 300)
4
1
S4: Priority 1 and priority 2
2
S3: Priority 1
S4: Priority 2
8
1
S8: Priority 1 and priority 2
2
S7: Priority 1
S8: Priority 2
12
1
S12: Priority 1 and priority 2
2
S11: Priority 1
S12: Priority 2
When setting parameters for system configuration, make sure not to exceed the number of relay/
control stages available:
No. of relays CL1 + No. of relays CL2 + number internal alarm relais
<= Number of VS 300 relay/control stages (4/8/12 depending on expansion stage)
Summary of Contents for VS 300
Page 8: ...vi Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 18: ...System Design of VS 300 10 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 22: ...Application of VS 300 14 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 160: ...Decommissioning and disposal 152 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 166: ...Alarms and Messages of VS 300 158 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...
Page 170: ...162 Doku Version 2 05 Firmware 2 10 15 September 2017 Notice ...