80
Eaton
®
Power Xpert
®
9395P-600 (300V-600V) Installation and Operation Manual 164000710—Rev 07
Figure 30. ISBM and UPM Section Conduit and Wire Entry Locations
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
BOTTOM VIEW
Front
Front
4.
Locate the external wiring terminal hardware kit packed on the bottom left side of the ISBM section.
5.
Using hardware from the external wiring terminal hardware kit (see
), connect phase A, B, and C
rectifier input power wiring from the utility source to the rectifier input terminals in the ISBM section. See
paragraph
UPS System Power Wiring Preparation
for wiring and termination requirements.