
Eaton
®
Power Xpert
®
9395P-600 (300V-600V) Installation and Operation Manual 164000710—Rev 07
67
Insert the forklift or pallet jack forks from the right side of the pallet (facing the cabinet), between the
supports on the bottom of the pallet. If the sections must be moved using the cabinet front or rear fork lift
slots, see the caution statements at the beginning of this procedure.
2.
Remove the three bolts securing the left side shipping bracket to the cabinet and three bolts securing the
bracket to the pallet (see
). Remove the left side shipping bracket.
Figure 19. Removing the ISBM Section Left Side Shipping Bracket
Front Door
Pallet
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Left Side Shipping
Bracket
NOTE
This figure depicts the Shipping Bracket on the 380V, 400V, 415V, and 480V Two UPM
configuration pallet. The 600V sections are oriented the same way and the shipping
brackets are removed the same way as this illustration.
3.
Remove the three bolts securing the right side shipping bracket to the cabinet and three bolts securing the
bracket to the pallet (see
). Remove the right side shipping bracket.
Summary of Contents for Power Xpert 9395P-600/600
Page 8: ......
Page 226: ...16400071007 164000710 07...