
114
Eaton
®
Power Xpert
®
9395P-600 (300V-600V) Installation and Operation Manual 164000710—Rev 07
4.
Remove the UPS cabinet top interface conduit landing plates to drill or punch conduit holes (see
).
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RMP II. See
for RMP II knockout hole location.
7.
Install wiring between the UPS and RMP II. See
and
for the Hot Sync CAN Bridge Card
terminal location and wiring information, and
, and
for the RMP II terminal
location and wiring information.
NOTE
120 Vac for the RMP II should be supplied from the critical bus by facility planners or the
customer.
8.
Install 120 Vac power wiring from the critical bus to the RMP II. See
,
, and
for
the terminal location and wiring information.
9.
Close the front door and secure the latch.
10. Restart the UPS. See
for startup instructions.
Figure 53. Remote Monitor Panel II and Remote Monitor Panel II Terminal Locations
Terminal TB1
Signal Connections
from the UPS
Ground
Terminal
Terminal TB3
120 Vac Power
Summary of Contents for Power Xpert 9395P-600/600
Page 8: ......
Page 226: ...16400071007 164000710 07...