59
GTS HUMIDIFIER LX SERIES INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
OPERATION
Dispersion
Ultra-sorb
Rapid-sorb
Single tube
Single tube with drain
Space distribution unit
Condensate/drain piping
Water seal height of dispersion system
________________________________
Air gap, open drain, or vacuum breaker within
12" (305 mm) vertical of LX unit
Condensate return to tank
Cold-start burner ignition
Burner 1 lights after:
First try
Second try
Third try
Burner 1 color after 15 minutes:
Blue
Orange
Red-orange
Burner 2 lights after:
First try
Second try
Third try
Burner 2 color after 15 minutes:
Blue
Orange
Red-orange
Flue gas oxygen range 5.5% ±1.0 at 100%
Flue gas CO ppm 0-60 ppm typical,
400 ppm max allowable
Safety testing to verify function
Low water test ________________________________
High humidity limit test ________________________
Airflow test
________________________________
Aquastat test ________________________________
Blocked flue test ________________________________
Additional comments
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Start-up commissioning checklist