78
/
96
Parameter
Description
Value range and dependencies
Factory setting
Access level Read
Access level Write
Re-start
required
2-5-3-3-2
Source
Flow estimation (VFD)
-
Everybody
Service
-
2-5-3-3-3
Time of stagnation
0 … 7 d
24 h
Everybody
Service
-
2-5-3-3-4
Response
Message
Message
Everybody
Service
-
Flushing with check run
2-5-3-4
Forced flushing
-
-
-
-
-
2-5-3-4-1
Forced flushing
Disabled
Disabled
Everybody
Service
-
Enabled
2-5-3-5
Flushing function
-
-
Everybody
Nobody
-
2-5-3-5-2
Minimum flushing time
0 … maximum flushing time
10 s
Everybody
Service
-
2-5-3-5-3
Maximum flushing time
Minimum flushing time … 999 s
60 s
Everybody
Service
-
2-5-3-5-4
Maximum flushing attempts in 24
hours
0 … 10
5
Everybody
Service
-
2-5-3-5-5
Stop temperature for flushing
0 … maximum temperature
20 °C
Everybody
Service
-
2-5-3-5-6
Flushing time for each pump
0 … 999 s
10 s
Everybody
Service
-
2-5-4
Emergency power operation
-
-
Everybody
Nobody
-
2-5-4-2
Maximum system load
1 … maximum number of pumps
1
Everybody
Service
-
2-5-4-3
Stop delay enabled/disabled
Disabled
Enabled
Everybody
Service
-
Enabled
2-5-5
Discharge pressure monitoring
-
-
Everybody
Nobody
-
2-5-5-1
High pressure alarm
-
-
Everybody
Nobody
-
2-5-5-1-1
Maximum discharge pressure
0 … maximum pump head
Maximum pump
discharge head
Everybody
Service
-
2-5-5-1-2
Delay time
0 … 60 s
10 s
Everybody
Service
-
2-5-5-1-3
Selection of pump response
Message
Message
Everybody
Service
-
Message and stop all pumps
2-5-5-2
Low pressure alarm
-
-
Everybody
Nobody
-
2-5-5-2-1
Minimum discharge pressure
0 … maximum pump head
0
Everybody
Service
-
2-5-5-2-2
Delay time
0 … 60 s
10 s
Everybody
Service
-
2-5-5-2-3
Selection of pump response
Message
Message
Everybody
Service
-
Message and stop all pumps
2-5-6
Pipe filling function
-
-
-
-
-
2-5-6-1
Pipe filling function
Disabled
Disabled
Everybody
Service
-
Enabled
2-5-6-2
Deviation from set-point
0 … set-point
10
Everybody
Service
-
Summary of Contents for Hydro-Unit Utility Line F
Page 29: ...29 96 1 2 Fig 12 PE connection 1 Earthing terminal 2 Location of power connection ...
Page 58: ...58 96 ...
Page 92: ...92 96 T Tank 79 Timers 73 W Warnings 9 Warranty claims 7 ...
Page 93: ......
Page 94: ......
Page 95: ......