Installation -6
Version 1.36
02/2004
4.
Connect the power cord.
Connect the power cord
6.
Press the on/stand-by button as illustrated to switch the machine on. The boiler is probably empty
when the machine is switched on for the first time, the heating element remains therefore off until the
boiler has been filled with water.
The indicator LED ‘Please wait, warming up’ (boiler temperature low indication) lights on and will thereafter
remain on until the operational temperature has been reached. This will take approx. 8 minutes for
220 V or up to 20 minutes for 110/120 V machines
Switch on the machine
5.
Install cup grille, drip tray and trough.
Inst
all drip tray
, cup grille and trough
The microprocessor will be initialized. This takes up to 30 seconds. During initialization all LED’s light
on.
Summary of Contents for Cafitesse 50
Page 4: ...Version 1 36 02 2004 ...
Page 20: ...Version 1 36 02 2004 ...
Page 30: ...Version 1 36 02 2004 ...
Page 38: ...Programming 8 Version 1 36 02 2004 4 3 Programming flow chart service device ...
Page 56: ...Version 1 36 02 2004 ...
Page 64: ...Version 1 36 02 2004 ...
Page 78: ...Version 1 36 02 2004 ...
Page 80: ......
Page 94: ...Version 1 36 02 2004 ...
Page 95: ...Version 1 36 02 2004 6 Preventive Maintenance Contents 02 2004 Not available ...
Page 96: ...Version 1 36 02 2004 ...
Page 102: ...Version 1 36 02 2004 ...
Page 103: ...Version 1 36 02 2004 8 Service Information Bulletins Contents 02 2004 Not available ...
Page 104: ...Version 1 36 02 2004 ...
Page 105: ...Version 1 36 02 2004 9 Modification Instructions Contents 02 2004 Not available ...
Page 106: ...Version 1 36 02 2004 ...