![Doosan D20G Service Manual Download Page 590](http://html.mh-extra.com/html/doosan/d20g/d20g_service-manual_2521450590.webp)
G424F(FE) Service Manual
Chapter 3. Engine Mechanical System
90
54.
Engine assembly; see “Engine Assembly –
Installation”, in this section.
Cylinder Block
Removal
Remove or disconnect
1.
Disassemble the engine as per instructions under
“Engine Disassembly”, in this section.
2.
Water and oil gallery bolts, with a 7-mm Allen
wrench and handle.
3.
Cylinder block seals.
Clean
•
Cylinder block, thoroughly.
Inspect
•
Cylinder block for cracks and wear.
Cylinder Reconditioning
If the cylinder block inspection discloses that only
the cylinder are out of roundness and that the
cylinder block may be reused, the cylinders can be
reconditioned by honing or by grinding or honing or
reboring.
If the wear or out-of-roundness is over 0.127 mm
(0.005 in.), the cylinders should be rebored and
honed until it is possible to install an oversize piston
after the reconditioning is finished.
Cylinder Honing
Note:
Some of the services that are next presented
are not necessarily performed when reconditioning
an engine.
The performance should depend on the inspections
to which the engines will be submitted before
reconditioning.
The finish after reboring should be made with a
cylinder hone. The initial honing should be
performed with thick stones and finish with thin
stones. It should not remain glistened, but with light
strokes, so as to help the lubrication.
Install the cylinder hone and lean the stones the
maximum as possible, so that the hone does not
remain blocked from being manually turned.
Connect a 19 mm (3/4 in.) electric driller to the hone,
make it rotate and, at the same time, slowly actuate
the hone upward and downward, all along the
cylinder length, until it freely turns.
When honing, insert into the cylinder a good amount
of kerosene, so as to keep the stones and cylinders
clean and lubricated.
Expand the hone stones and repeat the honing until
obtaining the required diameter.
Note:
Stop once in a while the honing and insert the
piston into the corresponding cylinder, so as to
check the play. Before inserting the piston,
thoroughly clean the cylinder.
After servicing the block, clean it thoroughly.
Install or connect
1.
Water and oil gallery bolts, with a 7-mm Allen
wrench and torque wrench; tighten.
Tighten
•
Bolts: 25 – 35 N
·
m (18 – 25,7 lb
·
ft.).
2.
Cylinder block seals, with tool 3-0006774 and
universal handle M-740463A.
3.
Assemble the engine, as per instructions under
“Engine Assembly”, in this section.
Summary of Contents for D20G
Page 2: ......
Page 5: ...Specifications TORQUE SPECIFICATIONS SB2004E00 D e c 1 9 9 8 ...
Page 14: ......
Page 16: ......
Page 138: ...Diesel Engine Engine System 124 NOTE The crankshaft must rotate freely by hand 02900058 ...
Page 254: ......
Page 256: ......
Page 260: ......
Page 341: ...4TNV98 4TNE98 Diesel Engine Section 3 Engine 87 4TNE98 Engine Figure 6 1 ...
Page 423: ...4TNV98 4TNE98 Diesel Engine Section 4 Fuel System 169 Fuel System Components Figure 7 1 ...
Page 477: ...4TNV98 4TNE98 Diesel Engine Section 7 Starter Motor 223 Starter Motor Troubleshooting ...
Page 494: ...4TNV98 4TNE98 Diesel Engine Section 8 Troubleshooting 240 Troubleshooting Charts ...
Page 495: ...4TNV98 4TNE98 Diesel Engine Section 8 Troubleshooting 241 ...
Page 496: ...4TNV98 4TNE98 Diesel Engine Section 8 Troubleshooting 242 ...
Page 498: ...4TNV98 4TNE98 Diesel Engine Section 8 Troubleshooting 244 4TNE98 Engine ...
Page 499: ...Service Manual G424FE LP Engine G424F LP Gasoline Engine G20G G25G G30G SB4320E00 Jan 2008 ...
Page 500: ......
Page 502: ......
Page 529: ...G424F FE Service Manual Chapter 2 Recommended Maintenance 29 ...
Page 534: ...G424F FE Service Manual Chapter 3 Engine Mechanical System 34 MAIN BEARINGS 0 50 UNDERSIZE ...
Page 584: ...G424F FE Service Manual Chapter 3 Engine Mechanical System 84 ...
Page 729: ...G424F FE Service Manual 229 Chapter 8 Basic Troubleshooting ...
Page 731: ...G424F FE Service Manual 231 Chapter 8 Basic Troubleshooting ...
Page 806: ......
Page 808: ......
Page 810: ......
Page 820: ...Power Train System Operation 14 Hydraulic System ...
Page 822: ...Power Train System Operation 16 Hydraulic System ...
Page 824: ...Power Train System Operation 18 Hydraulic System ...
Page 826: ...Power Train System Operation 20 Hydraulic System ...
Page 856: ......
Page 858: ......
Page 860: ......
Page 930: ......
Page 932: ......
Page 934: ......
Page 936: ......
Page 1018: ......
Page 1023: ...A374081 01 ELECTRIC SCHEMATIC MODEL D20 25 30G EM0K2 EM0K3 Cummins B3 3 ...
Page 1024: ...A654030 00 ELECTRIC SCHEMATIC MODEL D20 25 30G EM0QM EM0QN Yanmar 4TNE98 Tier 3 ...
Page 1025: ...A604500 00 ELECTRIC SCHEMATIC MODEL G20 25 30G EM0QF EM0QG GM G424F Non Certi LP ...
Page 1026: ...A604510 00 ELECTRIC SCHEMATIC MODEL G20 25 30G EM0QH EM0QJ GM G424F Non Certi GAS ...
Page 1027: ...A604516 00 ELECTRIC SCHEMATIC MODEL G20 25 30G EM0QY EM0QZ GM G424FE Tier 3 LP ...
Page 1028: ......
Page 1030: ......
Page 1059: ...Safety Section 29 Lean away from the direction of fall Lean forward ...
Page 1071: ...General Section 41 Typical Example Side Shifter Serial Number If Equipped ...