RF Baghouse, Models RFWP and RFWPH
34
Roof Installation
Note: The entire roof can be assembled prior to installing it
on the collector.
1. Apply sealant to the top bolt flange of the clean air plenum
assembly.
2. Lift the first half roof panel into position as shown and
insert the 1/2-in hardware around the perimeter and hand-
tighten it.
clean air plenum
assembly
upper flange
(top ring of
clean air
plenum)
roof panel
(install half of
roof panel)
sealant pattern
upper flange
Upper Flange
Sealant Application
bolt hole
lifting lug
Roof Installation, 12-ft Bag Clean Air Plenum shown