8 - CHASSIS
200
8.6 - REAR SUSPENSION
INSPECTING THE REAR SUSPENSION
1. Inspect:
- The swinging arm play.
Play => Tighten the joint shaft nut or replace the bushes.
- Swinging arm vertical movement
Irregular movement/warping/stains => Renew the bushes.
- Swinging arm vertical movement
2. Inspect:
- The shock absorber.
Fluid leaks/damage => Renew the shock absorber.
ENSURE THAT THE MOTOR-
CYCLE IS SUPPORTED FIRMLY,
AND THERE IS NO RISK OF IT
FALLING.
PUT THE MOTORCYCLE ON A
FLAT SURFACE.
REMOVAL
1. Remove:
- The top bolt (left-hand side) securing the nut on the
other end.
2. Remove:
- The bottom bolt.
WARNING
Summary of Contents for GPR 125 Racing
Page 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Page 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Page 170: ...6 COOLING SYSTEM 170 ...
Page 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Page 180: ...7 LUBRICATION SYSTEM 180 ...
Page 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Page 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Page 247: ...Rev 0 2009 ...