6 - COOLING SYSTEM
176
Ref. 866380
Tool kit (A-B-C) for extrac-
ting and fitting water pump
oil seal.
STEPS FOR REMOVING THE WATER PUMP:
- Remove the clutch cover.
- Remove the water pump cover and the turbines (right-
hand threads).
- Remove the shaft and the bearings using tool B.
- Remove the oil seal with A.
- Separate the elements from the shaft.
REFITTING THE PUMP AND THE NEW OIL SEAL STEP BY
STEP:
- Fit the shaft with the bearings using the press and tool B,
inserting it all the way in.
- Use A to fit the shaft/bearings assembly into its housing,
until the bearings are fully in.
- Position the oil seal and press it home until flush with
the cover.
B
A
N.B.
Summary of Contents for GPR 125 Racing
Page 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Page 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Page 170: ...6 COOLING SYSTEM 170 ...
Page 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Page 180: ...7 LUBRICATION SYSTEM 180 ...
Page 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Page 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Page 247: ...Rev 0 2009 ...