4 - ENGINE
122
5.
Fit:
- The engine crankcase gasket (8) (new gasket).
TO AID THE TASK, REST THE
ENGINE ON A WOODEN BOX.
6. Fit:
- The left-hand crankcase (9) onto the right-hand crankcase
(10), being guided by the centring studs (11).
MAKE SURE THAT THE GASKET
REMAINS IN THE CORRECT
POSITION.
TAP THE CRANKCASE COVER
LIGHTLY WITH A NYLON MA-
LLET.
TIGHTEN THE CRANKCASE
BOLTS IN SUCCESSION CROS-
SWISE, GOING FROM ONE TO
ANOTHER TWO OR THREE TI-
MES.
7. Fit:
- The 6 outer bolts (12) on the left-hand crankcase.
- The (longer) outer bolt (13) on the left-hand crankcase.
- The 5 inner bolts (14) on the left-hand crankcase.
- The (shorter) inner bolt (15).
Bolts (crankcases):
1,1-1,3 kgf.m (11-13 N.m)
9
8
11
10
WARNING
WARNING
12
14
12
14
12
13
15
N.B.
N.B.
Summary of Contents for GPR 125 Racing
Page 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Page 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Page 170: ...6 COOLING SYSTEM 170 ...
Page 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Page 180: ...7 LUBRICATION SYSTEM 180 ...
Page 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Page 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Page 247: ...Rev 0 2009 ...