4 - ENGINE
131
22.
Fit:
- The balance shaft gear (39).
- The intermediate balance shaft gear (40).
ALIGN THE CRANKSHAFT AND
BALANCER GEARS USING THE
GUIDE POINTS.
23.
Fije:
- The balance shaft locking tool (41).
Balance shaft locking tool:
Ref.
864486
-The balance shaft nut (42).
Balance shaft nut.
3,5-4,5 kgf.m (35-45 N.m)
24.
Remove:
- The balance shaft locking tool.
FIT THE TIMING CHAIN SPRO-
CKET WITH THE GUIDE POINT
FACING FORWARDS.
25. Fit:
- The timing chain sprocket (43).
26.
Fit:
- The timing chain (44).
FIT IT ON THE CENTRAL TEETH.
41
42
40
39
CAUTION
43
CAUTION
44
N.B.
Summary of Contents for GPR 125 Racing
Page 1: ...WORKSHOP MANUAL GPR 125 4 stroke ...
Page 169: ...6 COOLING SYSTEM 169 6 1 DIAGRAM OF THE SYSTEM ...
Page 170: ...6 COOLING SYSTEM 170 ...
Page 179: ...7 LUBRICATION SYSTEM 179 7 1 DIAGRAM OF THE SYSTEM ...
Page 180: ...7 LUBRICATION SYSTEM 180 ...
Page 192: ...8 CHASSIS 192 FITTING FRONT SUSPENSION ...
Page 202: ...9 BRAKING SYSTEM 202 9 BRAKING SYSTEM FRONT BRAKE REAR BRAKE 203 211 9 1 9 2 ...
Page 247: ...Rev 0 2009 ...