40
■ P1E
3.4.Current Transformer installation (DANGER)
1. The CT can be opened.
2. Take the CT clip on the Line conductor wire.
3. Take note of the direction of CT installation. Arrow symbol means utility grid.
4. Connect the CT wires to the device.
5. Put in the CT wire into the CT port.
L
N
Main Breaker
E
nergy meter
of the electric
utility
company
CT label direction
CT port
Installation
(
Wireless
)
Summary of Contents for PPM R4E
Page 2: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ...yhienergy co nz energysales yhi co nz YHI Energy 0800 99 33 44...