Operating method:
・
Touch and then on the home screen.
(3) Check the connection status and connection log page under "Inverter status" and "Information".
(4)
When the settings are complete, return to normal mode using "■Exiting service mode" (page 58).
[Replacing the Inverters]
Make the settings as described below if replacing a malfunctioning inverter.
The amount of power generated by the additional inverters cannot be measured unless
the following
settings are made.
(1) Reset and clear all the inverter data. (See the inverter installation and maintenance manual.)
(2) Set the number of the replacement inverter before connecting to the power monitor.
(3) Connect the replacement inverter to the power monitor.
(4) Check the connection status and connection log page under "Inverter status" and "Information".
(5) When the settings are complete, return to normal mode using "Exiting service mode" (page 58).
60
Service Mode