63
(5) Touch the number for the inverter to be replaced and the enabled power meter checkboxes,
enable the checkboxes, and touch the [Save] button.
(6) The settings complete dialog box will be displayed, so touch the [Yes] button.
[Initializing or Replacing the Power meter and the Wireless Communications Unit]
Make the settings as described below if replacing or initializing a malfunctioning wireless
communications unit.
Unless you make the following settings, the power meter and wireless communications unit will
not operate.
(1) Turn OFF the breakers for the solar generator connected to the power meter.
(2) Touch the number for the enabled power meter checkboxes, disable the checkboxes, and
touch the [Save] button.
(3) Initialize if replacing only the power meter. (Press and hold on page 56.)
※
If replacing both the power meter and wireless communications unit or the wireless
communications unit only, initialization is unnecessary.
接続設定画面
connection setting screen
設定完了ダイアログ
Settings complete dialog box
接続設定画面
connection setting screen
設定完了ダイアログ
Settings complete dialog box
(7) When the settings are complete, the "Home screen" will be displayed.
As processing is implemented immediately after the settings are made, a " " icon is
displayed, so check the following details 1 to 3 mins later.
・
Check that the " " icon is not displayed on the home screen.
・
Check that the values for the generator power, power consumption, and feed-in/purchased
electricity power icons have changed.
(8)
When the settings are complete, return to normal mode using "■Exiting service mode" (page 58).
サ
ービ
ス
モー
ドに
つ
いて
Service Mode
Summary of Contents for PPM R4E
Page 2: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ...yhienergy co nz energysales yhi co nz YHI Energy 0800 99 33 44...