Figure 64. Clip Cable Chains to Chassis Bracket
11.
Place the bezel over the front of the tray by pressing the release buttons on the bezel and placing it over the retaining slots on
the tray.
Figure 65. Install the Front Bezel
12.
Connect the power cables and Mini-SAS HD cables to the expansion enclosure.
Next steps
1.
Power on the expansion enclosure and storage system.
2.
Change the operation mode of the Storage Center to Normal.
3.
Use SupportAssist to send diagnostic data to Dell Technical Support.
Cable Management Arms
The SCv360 expansion enclosure supports cable management arms in racks with a depth of 1200 mm (47.2 in.).
The cable management arms attach to the back of the expansion enclosure chassis and the rack rails.
54
Replacing SCv360 Expansion Enclosure Components