![Dell SC8000 Deployment Manual Download Page 176](http://html.mh-extra.com/html/dell/sc8000/sc8000_deployment-manual_79830176.webp)
Chapter 6 Perform Post-Setup Tasks
166
Storage Center SC8000 Controller Deployment Guide
f
Click
Continue
.
The
wizard
displays
a
summary.
g
Click
Create
Now
.
The
wizard
displays
a
list
of
optional
actions.
h
Click
Close
.
The
wizard
closes.
6
Create
a
25
GB
test
volume
called
TestVol1.
a
In
the
System
Tree,
select
Volumes
.
a
In
the
Create
Server
wizard,
click
Create
Volume
.
the
Create
Volume
wizard
appears.
b
Set
the
volume
size
to
25
GB,
then
click
Continue
.
c
Click
Continue
to
apply
the
default
Replay
Profile.
d
Type
TestVol1
in
the
Name
field,
then
click
Continue
.
The
wizard
displays
a
summary.
e
Click
Create
Now
.
The
wizard
displays
a
list
of
optional
actions.
f
Click
Close
.
7
(Dual
‐
controller
only)
Repeat
to
create
a
second
test
volume
named
TestVol2.
8
Map
TestVol1
to
the
first
controller.
a
In
the
System
Tree,
expand
the
Volumes
node.
b
Select
TestVol1
.
c
Click
Map
Volume
to
Server
.
The
Map
Volume
to
Server
wizard
appears.
d
Select
the
server,
then
click
Continue
.
The
wizard
displays
a
summary.
e
Click
Advanced
.
The
wizard
displays
advanced
mapping
options.
f
In
the
Restrict
Mapping
Paths
area,
select
the
Map
to
controller
check
box,
then
select
the
controller
from
the
drop
‐
down
menu.
g
Click
Continue
.
The
wizard
displays
a
summary.
h
Click
Create
Now
.
The
mapping
is
created
and
the
wizard
closes.
9
(Dual
‐
controller
only)
Repeat
to
map
TestVol2
to
the
second
controller.
10
On
the
server,
partition
and
format
the
test
volume(s).
Test Connectivity and Failover
Copy
data
to
the
test
volume
and
simulate
failures
to
test
connectivity
and
failover.
Test Basic Connectivity
Verify
connectivity
by
copying
some
data
to
the
test
volume(s).
Test Controller Failover
If
the
Storage
Center
has
dual
controllers,
perform
a
test
to
make
sure
that
IO
is
not
interrupted
by
a
controller
failover.
1
Create
a
Test
folder
on
the
server
and
copy
at
least
2GB
of
data
into
it.
2
Manually
shut
down
the
first
controller
while
copying
data
to
TestVol1
to
verify
that
IO
is
not
interrupted
by
the
failover
event.
a
Copy
the
Test
folder
to
the
TestVol1
volume.
b
During
the
copy
process,
shut
down
the
first
controller
(the
controller
through
which
the
volume
is
mapped).
c
Verify
that
the
copy
process
continues
after
the
controller
is
shut
down.