Rev 2022-03-08
Pharmafill Model TC3 User Manual
Deitz Company Inc.
TC3 User Manual
Page 35
8.2 - Bottle Gating Cylinder Positioning (Cont’d)
GATE 2
NORMAL
FILLING
POSITION
GATE 2 EXTENDED
GATE 1 EXTENDED
BOTTLE GATING EXPLAINED
The supply of bottles moves down the conveyor
and comes to rest on Gate 1, which holds the
bottle at the exact filling position.
Gate 2 is positioned downstream (usually to the
right) of Gate 1 by a distance equal to one bottle
width (dimension A).
When filling, the first bottle will be held at the
filling position by Gate 1 and there will be no
bottle at Gate 2.
When the target count is reached, Gate 1 retracts
and Gate 2 extends. The supply of bottles moves
forward one position. Now a new empty bottle is
in the filling position.
When the Index Time has passed, Gate 1 extends
and Gate 2 withdraws and filling begins again.
The previously filled bottle moves down the
conveyor.
FILLED BOTTLE AT GATE 2
FILLED BOTTLE EXITING
GATE 1
A
Summary of Contents for Pharmafill TC3
Page 1: ...Model TC3 Electronic Counter Operation Manual...
Page 44: ...Rev 2022 03 08 Pharmafill Model TC3 User Manual Deitz Company Inc TC3 User Manual Page 32...
Page 69: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......