5.8 Connecting the Components
5.8.1 Servo Access Box
WARNING
HIGH VOLTAGE
Potentially lethal voltage is present on the connectors.
•
Before working on the power connectors
(disconnecting or connecting the cable),
disconnect the SAB from the mains and wait for
the discharge time to elapse.
Step 1: Connect the feed-in cable
1
2
3
4
5
6
7
130BE659.10
1
24/48 V IN (auxiliary input terminal)
2
Cable tie
3
Cable clamp for ISD Line 1: STO 1 (STO output to hybrid
cable line 1)
4
PE grounding
5
Cable clamp for feed-in cable
6
Feed-in cable for line 1
7
Feed-in cable for line 2
Illustration 5.1 Connecting the Feed-In Cable
1.
Insert the 4 connectors on the feed-in cable into
their corresponding terminal block on the SAB.
2.
Secure the feed-in cable [6] using the cable
clamp [5], ensuring that the shield is positioned
exactly under the clamp.
3.
Secure the STO cable using the cable clamp [3],
ensuring that the shield is positioned exactly
under the clamp.
4.
Ground the PE wire using the PE terminal [4].
NOTICE
If using 2 lines of servo drives, repeat the process for the
2
nd
line [7].
Step 2: Connect the AUX cable
130BE315.10
1
2
1
Cable tie
2
Cable clamp for ISD Line 2: STO 2 (STO output to hybrid
cable line 2)
Illustration 5.2 AUX Connector on the SAB
1.
Insert the wires into the 24/48 V IN (auxiliary
input) connector as described in
chapter 3.3.1.7 AUX Connectors
.
2.
Insert the 24/48 V IN (auxiliary input) connector
into the SAB and secure the cable using the cable
tie [1].
Electrical Installation
Operating Instructions
MG75K102
Danfoss A/S © 12/2015 All rights reserved.
37
5
5