User’s Manual EM11A017
DCM601A71 intelligent Touch Manager
228
Plan
Check
Action
Do
Check Action
Yearly PDCA cycle
Weekly PDCA cycle
Needs
Start position for a user who wants to manage the energy consumption
immediately after iTM implementation.
Start position for a user who wants to check the actual energy consumption and operational status
of the equipment in the iTM implementation year, and start managing the energy consumption the next year.
Scenario transition
Scenario executed manually
Scenario utilizing this function
[Legend]
Check the energy
consumption of last year.
Check the energy
consumption of this month
with respect to the energy
consumption plan.
Check the reduction
effect due to equipment
and structure renewal.
Check the energy consump-
tion of this year with respect
to the energy consumption
plan.
Check the measured
actual energy
consumption.
Check the actual opera-
tion for creating the
operation plan. (The
user performs a simple
hypothesis testing on
operational statuses.)
Create the equipment
operation plan.
Create the energy
consumption plan.
Operate the equip-
ment based on the
energy consump-
tion reduction plan.
Operate the equip-
ment based on the
equipment opera-
tion plan.
Check for gaps from the
equipment operation plan.
Change the equipment
operation plan.
Look for operational
improvement points
based on detailed
equipment data.
Study equipment and
structure renewal.
Study the equipment
operation plan for the
next year.
Study the energy
consumption plan
for the next year.
I want to know the gap with
the equipment operation plan.
I want to know the progress
of the energy saving plan.
I want to know the progress of
the energy saving plan.
This chapter describes the functions, their settings, and how to use them.
Prior trial is necessary for using this function. Consult a service person before use.
NOTE
Summary of Contents for Intelligent Touch Manager DCM601A71
Page 309: ...EM11A017 1208 HT...