![background image](http://html.mh-extra.com/html/daikin/arkh20cvmb7/arkh20cvmb7_service-manual_501299162.webp)
SiENBE04-512A
Indoor Unit
Removal Procedure
153
6
Control PCB.
The control PCB is
integrated with the power
supply PCB.
3. Remove swing motor
assembly.
1
To remove swing motor
assembly, remove two
screws.
(Manual adjusting for
the vertical blades.)
Provide a supporter so that
the joint link will not drop off,
in case the horizontal blade
assembly is removed.
Step
Procedure
Points
S
7(F
a
n motor)
S
6(
S
wing motor)
JC
JB
(R2541)
S3
2
(He
a
t exch
a
nger thermi
s
tor)
JA
(Addre
ss
)
S
21
(HA termin
a
l)
Gl
ass
t
abu
f
us
e
3
.15A
250V
S
wing motor
(R254
3
)
SiENBE04-512A.book Page 153 Friday, October 5, 2007 1:49 PM
Summary of Contents for ARKH20CVMB7
Page 1: ...SiENBE04 512A Service Manual Inverter Pair Wall Mounted Type C Series D Series ...
Page 17: ...List of Functions SiENBE04 512A 8 List of Functions ...
Page 37: ...Specifications SiENBE04 512A 28 Specifications ...
Page 73: ...Control Specification SiENBE04 512A 64 Function and Control ...
Page 103: ...Instruction SiENBE04 512A 94 System Configuration ...
Page 147: ...Check SiENBE04 512A 138 Service Diagnosis ...
Page 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 512A 216 Removal Procedure ...
Page 229: ...Others SiENBE04 512A 220 Others ...
Page 241: ...Wiring Diagrams SiENBE04 512A 232 Appendix ...