![background image](http://html.mh-extra.com/html/daikin/arkh20cvmb7/arkh20cvmb7_service-manual_501299209.webp)
Outdoor Unit / RK(X)H-C, ARK(X)H-C, R(Y)N-C
SiENBE04-512A
200
Removal Procedure
3.6
Removal of Compressor Sound Insulation Pad
Procedure
Warning
Be sure to turn off all power supplies at least 10 min. before
disassembling work.
Step
Procedure
Points
1. Remove the right side
panel.
Preparation
Remove the electrical box
according to the removal of
electrical box.
1
Dismount the right side
plate by removing the
screw.
2
Remove the outdoor air
thermistor.
The thermistor assembly is
a set of the outdoor air
thermistor, heat exchanger
thermistor and discharge
pipe thermistor.
3
Remove the 2 screws
at the back of the right
side panel.
Binding
ba
nd
(R44
8
1)
SiENBE04-512A.book Page 200 Friday, October 5, 2007 1:49 PM
Summary of Contents for ARKH20CVMB7
Page 1: ...SiENBE04 512A Service Manual Inverter Pair Wall Mounted Type C Series D Series ...
Page 17: ...List of Functions SiENBE04 512A 8 List of Functions ...
Page 37: ...Specifications SiENBE04 512A 28 Specifications ...
Page 73: ...Control Specification SiENBE04 512A 64 Function and Control ...
Page 103: ...Instruction SiENBE04 512A 94 System Configuration ...
Page 147: ...Check SiENBE04 512A 138 Service Diagnosis ...
Page 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 512A 216 Removal Procedure ...
Page 229: ...Others SiENBE04 512A 220 Others ...
Page 241: ...Wiring Diagrams SiENBE04 512A 232 Appendix ...