![background image](http://html.mh-extra.com/html/daikin/arkh20cvmb7/arkh20cvmb7_service-manual_501299164.webp)
SiENBE04-512A
Indoor Unit
Removal Procedure
155
4
Disengage the hooks of
the pipe retainer on the
back.
5
Pull auxiliary pipe
forward to an angle of
10 to 20 degrees.
Be careful to prevent pipe
deformation.
6
Disengage hooks
located right and left
side, and pull heat
exchanger forward.
The hooks are
symmetrically placed in
the right and the left.
Lifting the heat-exchanger
slightly upward to the right,
the left hook comes to be
disengaged easily.
Step
Procedure
Points
Pipe ret
a
iner
(R2547)
Thi
s
hook i
s
loc
a
ted
b
oth
s
ide of he
a
t exch
a
nger.
Pre
ss
thi
s
hook to remove he
a
t exch
a
nger e
as
ily.
(R2549)
SiENBE04-512A.book Page 155 Friday, October 5, 2007 1:49 PM
Summary of Contents for ARKH20CVMB7
Page 1: ...SiENBE04 512A Service Manual Inverter Pair Wall Mounted Type C Series D Series ...
Page 17: ...List of Functions SiENBE04 512A 8 List of Functions ...
Page 37: ...Specifications SiENBE04 512A 28 Specifications ...
Page 73: ...Control Specification SiENBE04 512A 64 Function and Control ...
Page 103: ...Instruction SiENBE04 512A 94 System Configuration ...
Page 147: ...Check SiENBE04 512A 138 Service Diagnosis ...
Page 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 512A 216 Removal Procedure ...
Page 229: ...Others SiENBE04 512A 220 Others ...
Page 241: ...Wiring Diagrams SiENBE04 512A 232 Appendix ...