Removal and installation of 3-point hitch implement (with pto shaft)
1. place implement on the level
ground.
2. drive the tractor backward to move
as close as possible to an imple-
ment. (approx. 5 cm)
then, adjust the height of the low-
er link to be parallel to the pins of
the implement.
3. put all the shift levers in the neu-
tral position.
(1) Implement support
(2) Lower Link
(1) check Link pin
4. Remove the pins on either side of
the check link.
5. Remove the ball assembly by
pushing the guide pin operating
lever.
(1) Lever
(2) ball Assembly
tg2o617a
tg2o618a
a40o613a
px9530 / px1053 / px1153 / px1303
6
-
TG120-수출향-US-06.indd 2
2017-09-15 오후 3:09:04
Summary of Contents for KIOTI PX1053
Page 12: ...TG120 수출향 US 00 indd 12 2017 10 20 오후 5 57 25 ...
Page 138: ...MEMO MEMO TG120 수출향 US 04 indd 72 2017 10 20 오후 6 00 41 ...
Page 164: ...MEMO MEMO TG120 수출향 US 05 indd 26 2017 09 14 오후 6 57 53 ...
Page 236: ...MEMO MEMO TG120 수출향 US 07 indd 52 2017 10 26 오후 1 20 58 ...
Page 247: ...10 10 INDEX INDEX 10 2 TG120 수출향 US 10 indd 1 2017 10 20 오후 6 01 17 ...
Page 256: ...TG120 수출향 US 10 indd 10 2017 10 20 오후 6 01 18 ...