UPS
(Uninteruptible Power Supply)
Maintenance:
Regular equipment testing should be part of a facility’s UPS maintenance schedule. The
UPS is located in the case with the Server computer provided by CurveBeam. Such a
schedule might include the following elements:
Quarterly:
• Visually inspect equipment for loose connections, burned insulation or any other signs
of wear.
Semiannually:
• Visually check for liquid contamination from batteries and capacitors.
• Clean and vacuum UPS equipment enclosures.
• Check HVAC equipment and performance related to temperature and humidity.
Annually:
• Provide a complete operational test of the system, including a monitored battery-
rundown test to determine if any battery strings or cells are near the end of their useful
lives.
Planned Maintenance - Annual Schedule:
The system requires normal periodic inspection and maintenance. Scheduled periodic
inspections are necessary to detect problems which can result from excessive wear,
loose items, chafing wires, and mis-adjusted parts from continual system use. In
addition to mechanical inspection and calibration, a series of image performance tests
are to be conducted. Planned maintenance is to be performed annually by a factory
trained Service Technical.
Planned Maintenance Checklist
Inspect X-ray Source
Serial Number Label
Warning and Indicators
Oil Leaks
Summary of Contents for pedCAT
Page 37: ...36 0473 90001 Rev 07 26 13 Tube Head Label Beam Limiter Label X Ray Power Supply label ...
Page 40: ...39 0473 90001 Rev 07 26 13 Laser Lights Button ...
Page 93: ...92 0473 90001 Rev 07 26 13 Beam Path and Angulation ...
Page 97: ...96 0473 90001 Rev 07 26 13 ...
Page 144: ...143 0473 90001 Rev 07 26 13 ...
Page 168: ...167 0473 90001 Rev 07 26 13 ...