9 of 64
CORRADI S.R.L.
- INSTALLATION MANUAL - PERGOTENDA ® MAESTRO
REV.1 - 11.2019
CONTENTS
1 WALL INSTALLATION
Ex
ter
nal side
Ex
ter
nal side
Fig. 3
- Use a water level to check the linearity of the drawn traces.
Fig. 4
- Position the brackets on the line on the wall and mark the fixing holes.