55 of 64
CORRADI S.R.L.
- INSTALLATION MANUAL - PERGOTENDA ® MAESTRO
REV.1 - 11.2019
FOLDED AWNING SIDE
PROJEC
TION SIDE
Fig. 71
Complete the assembly operations of the anti-rebound system:
- insert the anti-rebound barrier complete with supports
(A)
inside the gutters
(B)
on the projection sides. -
Det. X
- Fit first those near the stacked gutter (first
1
then
2
). Position the profile at 10 mm from the corner.
22 ANTI-REBOUND SYSTEM INSTALLATION
1
1
2
2
B
A
Det. X
10 mm
B
A