
2KJ/2KH
1-3-3
High voltage
U100
Setting the main high voltage
Grid control voltage
Copy interval
Copy quantity
Correction amount
*1
*1
*1
U101
Setting the other high voltages
Setting the developing bias
Setting the transfer voltage
Setting the separation voltage
*1
U110
-
Developing
U130
Initial setting for the developing unit
-
U144
Setting toner loading operation
OFF/5/30
*1
U150
-
U157
Checking/clearing the developing drive time
-
U158
-
Fuser and
cleaning
U161
Setting the fuser control temperature
Primary stabilization fixing temperature
Secondary stabilization fixing temperature
Copying operation temperature 1
Copying operation temperature 2
*1
*1
U162
-
U163
Resetting the fuser problem data
-
U167
Checking/clearing the fuser counts
-
U198
Setting the fuser phase control
OFF
*1,*2
U199
Checking the fuser temperature
-
Operation
panel and
support
equipment
U200
-
U202
Setting the KMAS host monitoring system
-
U203
-
U204
Setting the presence or absence of a key card or key counter
OFF
*1,*2
U207
Checking the operation panel keys
-
U233
MODE0
*1
U243
Checking the operation of the DP motors
-
U244
-
U245
-
U246
U249
Checking the paper ejection to optional devices
-
Mode setting
U250
150000
*1,*2
U251
Checking/clearing the maintenance count
-
U252
JAPAN
*1
U253
Switching between double and single counts
DOUBLE COUNT
(A3/LEDGER)
*1,*2
U254
Turning auto start function ON/OFF
ON
*1,*2
U260
Selecting the timing for copy counting
EJECT
*1,*2
Section
Item
No.
Content of maintenance item
Initial
setting*
*Initial setting for executing U020, *1: The item initialized for executing U020, *2: The item initialized for executing U021
Summary of Contents for CS 181
Page 1: ...SERVICE MANUAL Published in June 2009 2KJSM940 CS 181 CS 221...
Page 3: ...Revision history Revision Date Replaced pages Remarks...
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 14: ...2KJ 2KH This page is intentionally left blank...
Page 114: ...2KJ 2KH 1 3 74 This page is intentionally left blank...
Page 152: ...2KJ 2KH 1 4 38 This page is intentionally left blank...
Page 292: ...INSTALLATION GUIDE FOR PAPER FEEDER...
Page 306: ...INSTALLATION GUIDE FOR DUPLEX UNIT...
Page 315: ...INSTALLATION GUIDE FOR BUILT IN FINISHER...
Page 327: ...INSTALLATION GUIDE FOR JOB SEPARATOR...
Page 336: ...INSTALLATION GUIDE FOR FAX System R...
Page 351: ...INSTALLATION GUIDE FOR Scan System F B...
Page 354: ......
Page 355: ......