![Consilium Salwico CS4000 Installation Manual Download Page 32](http://html1.mh-extra.com/html/consilium/salwico-cs4000/salwico-cs4000_installation-manual_2655077032.webp)
Installation Manual
Chapter 4: Commissioning requirements
Salwico CS4000
22
Part C: Central status
1. All control and indication functions must be connected to relay
outputs. Outputs and inputs according to Consilium terminal
drawings.
2. All loops shall be connected to the central according to Consilium
terminal drawings.
3. All deviations from above criteria cause delay-time and any
consequence will be invoiced.
4. No power to be connected to the central unit without presence of
a Consilium engineer!
The requirements are made in order to minimise the start-up costs for
yard/owner during the commissioning.
Summary
The following document must be filled in and faxed to Consilium
+46 - 31 710 78 00 and your local Consilium representative in your
country before commissioning of the system starts.
”Address list/test report”, appendix A, one for each loop.
Summary of Contents for Salwico CS4000
Page 2: ......
Page 4: ......
Page 7: ...Fire Alarm System CS4000 Installation Manual Consilium...
Page 10: ......
Page 37: ...Installation Manual Appendix A Address list Test report Salwico CS4000 27...
Page 38: ...Installation Manual Appendix A Address list Test report Salwico CS4000 28...
Page 42: ......
Page 44: ......
Page 50: ......
Page 51: ...Fire Alarm System CS4000 User Guide Consilium...
Page 87: ......
Page 130: ......
Page 138: ......
Page 146: ......
Page 152: ......
Page 154: ......
Page 158: ......
Page 162: ......
Page 166: ......
Page 172: ......
Page 188: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 214: ......
Page 224: ......
Page 225: ...Copyright Consilium Marine AB www consilium se G teborg Sweden...
Page 226: ......
Page 228: ......
Page 230: ......
Page 232: ......
Page 234: ......
Page 235: ...Copyright Consilium Marine AB www consilium se G teborg Sweden CUT OUT...
Page 236: ......
Page 237: ...Copyright Consilium Marine AB www consilium se G teborg Sweden MOUNTING PLATE...
Page 238: ......
Page 239: ...Copyright Consilium Marine AB www consilium se NOTE 115VAC...
Page 240: ......
Page 241: ...Copyright Consilium Marine AB www consilium se...
Page 242: ......
Page 243: ...Copyright Consilium Marine AB www consilium se...
Page 244: ......
Page 245: ...Copyright Consilium Marine AB www consilium se...
Page 246: ......
Page 247: ...Copyright Consilium Marine AB www consilium se...
Page 248: ......
Page 249: ...Copyright Consilium Marine AB www consilium se...
Page 250: ......
Page 252: ......
Page 253: ...Copyright Consilium Marine AB www consilium se NOTE 115VAC...
Page 254: ......
Page 255: ...Copyright Consilium Marine AB www consilium se...
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......
Page 260: ......
Page 261: ......
Page 262: ......
Page 263: ......
Page 264: ......
Page 265: ......
Page 266: ......
Page 267: ...Copyright Consilium Marine AB www consilium se G teborg Sweden...
Page 268: ......
Page 270: ......
Page 272: ......
Page 274: ......
Page 276: ......
Page 277: ...Copyright Consilium Marine AB www consilium se G teborg Sweden MAX 20 IS UNITS PER ISOLATOR...