
Overview of Server Installation
2-5
Compaq Confidential – Need to Know Required
Writer:
Donna Hollas
Project:
Compaq ProLiant ML330 Setup and Installation Guide
Comments:
Part Number:
173868-001
File Name:
c-ch2 Overview of Server Installation.doc
Last Saved On:
1/17/00 1:37 PM
1.
After the cables have been connected to the server, you are ready to
power up the ProLiant ML330. To power up your server:
a.
Press and release the circular indentation
on the left side of the
drive bay door to release the door latch.
b.
Swing the drive bay door
open.
c.
Press the center of the power button
on the front of the server.
1
2
3
Figure 2-2. Powering up the server
2.
Follow the screen instructions to complete the factory-installed
operating system process.
3.
Refer to Chapter 5, “Server Configuration and Utilities,” and the
Compaq Management CD for information about installing the Compaq
Management Agents for your operating system.
4.
After verifying your server configuration, back up your system
configuration. Refer to SmartStart and Support Software CD for further
information on backing up your system configuration.
5.
Install any application software.
If you need to install additional options not preinstalled on your server, follow
the steps in Chapter 3.