12-5
Compaq Professional Workstation 5100 Reference Guide
Writer: Erica T Blakeney Project: Compaq Professional Workstation 5100 Reference Guide Comments: 299348-003
File Name: M-CH12.DOC Last Saved On: 3/12/98 12:22 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
8. Place the heatsink bridge (included in the processor upgrade kit) on top
of, and between, the primary and secondary processors.
Figure 12-4. Attaching the heatsink bridge
NOTE
: Hook ends over the outside of the heatsink fins.
9. Reassemble the workstation.
IMPORTANT:
Prior to replacing the expansion board cage, read “Important
Guidelines for Expansion Board Cage Replacement” earlier in this chapter.
10. Test the system (optional) using the Computer Checkup (TEST) utility.
See Chapter 2 for instructions.
IMPORTANT:
If you are installing a second processor, you must install a
new Multiprocessing HAL. For information on upgrading the HAL from a one-
processor system to a two-processor system, see the instructions provided
with the processor upgrade kit.
NOTE
: For more information on installing additional processors, refer to the
processor upgrade kit.