9.1.5 Cut 1 piece of spiral wrap 10” in length.
9.1.6 Wrap spiral wrap around ribbon so that it wraps around the ½” core tube. Secure with cable tie.
See photos 230-232.
Note:
Straighten steel strength members back into original position.
9.1.7 If cable is shielded and to be grounded, proceed to
Section 9.2
, Cable and External Grounding.
9.1.8 Proceed to
Section 9.3
, Cable Retention
9.1.9 Snap cable retention assembly into the appropriate location. Secure with bolts if grounded. See photos 233-235.
9.1.10 Remove ribbon containing fiber(s) to be spliced from fiber stack.
Apply spiral
Core tube
Photo # 230
Secure with cable tie.
Photo # 231
Left entry
port
Right
entry port
Photo # 232
Left
side entry
port No ground
Snap into
cavity.
Photo #233
Right
side entry
port No ground
Snap into
cavity.
Photo #234
Either
Left side
OR
Right side
entry ports. Ground bar & Inline
bar installed
Snap into
cavity
&
install (3)
bolts.
Photo #235