5.1.8 If cable enters closure from the right, mark buffer tube
23”
from sheath opening, ring cut and remove tubing.
See Figure 6.
5.1.9 If cable enters closure from the left, mark buffer tube
17”
from sheath opening, ring cut and remove tubing.
See Figure 7.
5.1.10 Proceed to
Section 5.4
Fiber Routing and Splicing.
Figure 7
Cable
entering
closure from
the
RIGHT
Figure 6
LBT 23”
55” of outer sheath
Fiber to be
spliced
Cable
entering
closure from
the LEFT
LBT 17”
55” of outer sheath
Fiber to be
spliced
Figure 7
Cable
entering
closure from
the
LEFT
Mini
-
OTE 300 Installation Guide