Mini
-
OTE 300 Installation Guide
All trademarks used in this publication are CommScope registered
201
9
CommScope Inc. All rights Reserved
50
7.4.7 Route fibers to be spliced to top tray. See photos 179-181.
7.4.8 Splice per standard practice. Replace dust cover on tray after splicing.
Middle Splice Tray
Fiber to be
spliced routing
up to top splice
Photo #180
Top Splice Tray
Photo #181
Fiber to be
spliced routing
up to top splice
Feed Thru
Tray
Routing Tray
Fiber to be spliced
Photo #179
Caution:
SMOUVS
must
be
centered when placed in the holders.