InteliNano-NT Plus, SW version 2.0.1.x,
©ComAp – July 2015
20
4.6.5 MRS application: 3 Phase 4 Wires
G
L1
L2
L3
L3
L2
L1
N
N
Figure 4.13
MRS
APPLICATION
3
P
HASE
4
W
IRES TERMINALS CONNECTION
4.6.6 MRS application: 3 Phase 3 Wires
G
L1
L2
L3
L3
L2
L1
Figure 4.14
MRS
APPLICATION
3
P
HASE
3
W
IRES TERMINALS CONNECTION
N
OTE
:
In case of Voltage Autodetect function and HIGH-LEG DELTA connection, the N (neutral) wire (in the
diagram connected between T6 and T9) has to be connected to terminal T20.