IGS-NT-BC, SW Version 1.2.0,
©ComAp – January 2019
IGS-NT-BC-1.2.0 Reference Guide.PDF
161
Group: Power management
Value: BankPriority
Group
Pwr management
Units
-
Related FW
3.0
Description
This value shows current priority number. It corresponds to the setpoint
except following situations:
•
If at least one of binary inputs
Priority SW "X"
is configured on some
source and is active then the actual gen-set priority is given by the
combination of these inputs.
•
If a
forcing binary input is active, the actual gen-set priority is given by the
alternative setting from the force value function.
•
If the
Gen-set size optimalization
is active then the actual priority is given
by the optimalization function.
Value: Act Reserve
Group
Pwr management
Units
-
Related FW
3.0
Description
Actual
absolute reserve
.
Value: Reserve
Group
Pwr management
Units
-
Related FW
3.0
Description
Actual
absolute reserve
for start. This value contains a copy of the setpoint
#LoadResStrt
from the currently selected
reserve set
.
Value: Reserve Stp
Group
Pwr management
Units
kX
Related FW
3.0
Description
Actual
absolute reserve
- when the reserve is higher than this value the last
started gen-set (the gen-set with the highest priority) is stopped. This value
contains the following:
#LoadResStop
plus
Nominal power
of the genset which is
first to stop. #LoadResStop is used from the currently selected
reserve set
.
Value: ActRes rel
Group
Power management
Units
%