Installation of the ADU
3-20
Chapter 3: Installation
98-133966-G1
9. Put the coaxial ADU cable through the protection plate as shown in
the following figure, and connect the N connector of the ADU cable
to the ADU.
Select a suitable size for the cable gland: 16—20 mm diameter or
19—23 mm diameter. See also
N-connector interface on the ADU
on page A-8 for a more detailed drawing how to connect the N-
connector on the ADU.
Ensure that the connector assembly is properly protected against
seawater and corrosion. As a minimum, wrap it with self-
amalgamating rubber.
10.Put the protection plate in place and fasten the 4 bolts (picture 5).
11.Fasten the nut (picture 6).
Where the cables are exposed to mechanical wear — on deck, through
bulkheads, etc. — protect the cables with steel pipes. Otherwise, follow
standard procedures for cabling in ship installations.
Figure 3-18: Connecting the ADU cable
Protection plate
N connector
1
2
3
4
5
6
SAILOR900TM.book Page 20 Monday, September 16, 2013 11:01 AM
Summary of Contents for Sailor 900 VSAT
Page 2: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 2 15 04 2013 15 54 39 ...
Page 28: ...List of tables xxvi 98 133966 G1 SAILOR900TM book Page xxvi Monday September 16 2013 11 01 AM ...
Page 257: ...Appendices SAILOR900TM book Page 1 Monday September 16 2013 11 01 AM ...
Page 258: ...SAILOR900TM book Page 2 Monday September 16 2013 11 01 AM ...
Page 355: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 3 15 04 2013 15 54 40 ...