Installation check list: Antenna
7-2
Chapter 7: Installation check
98-133966-G1
8.
Make sure that the requirements
for mast foundation and height,
including flatness, gusset plates
and distance from welding
seams are met.
9.
Make sure that the distances to
radar, Inmarsat systems, GPS
receivers and other transmitters
are as required.
10.
Make sure that the drain tube is
open and risk for water intrusion
is at a minimum.
11.
Check that the ADU is grounded
correctly, using the mounting
bolts.
and
Step
Task
Further information
Done
Table 7-1: Installation check list: Antenna (Continued)
SAILOR900TM.book Page 2 Monday, September 16, 2013 11:01 AM
Summary of Contents for Sailor 900 VSAT
Page 2: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 2 15 04 2013 15 54 39 ...
Page 28: ...List of tables xxvi 98 133966 G1 SAILOR900TM book Page xxvi Monday September 16 2013 11 01 AM ...
Page 257: ...Appendices SAILOR900TM book Page 1 Monday September 16 2013 11 01 AM ...
Page 258: ...SAILOR900TM book Page 2 Monday September 16 2013 11 01 AM ...
Page 355: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 3 15 04 2013 15 54 40 ...