Installation check list: ACU, connectors and wiring
98-133966-G1
Chapter 7: Installation check
7-3
7777
Installation check
7.2
Installation check list: ACU,
connectors and wiring
Step
Task
Verification and further
information
Done
1.
Check that the ACU is grounded correctly,
using the mounting bolts and washers.
and
2.
Make sure you strain relieved the cables.
See
3.
Make sure that the VSAT modem is
mounted close to the ACU.
See
4.
Check that the ADU antenna N-connector is
properly connected with the 50 Ohm RF
cable.
Visual inspection of the
cover plate at the bottom
of the ADU.
5.
Check that the ACU antenna N-connector is
properly connected with the 50 ohm RF
cable.
Visual inspection of the
connector panel of the
ACU.
6.
Check that the ACU's
Rx Out
is connected
to the VSAT modem’s Rx in using the
included 1 m F-F 75 ohm cable.
Visual inspection of the
connector panel of the
ACU and the VSAT
modem.
7.
Check that the ACU's
Tx In
is connected to
the VSAT modem's Tx out using the
included 1 m F-F 75 ohm cable.
Visual inspection of the
connector panel of the
ACU and the VSAT
modem.
Table 7-2: Installation check list: ACU, connectors and wiring
SAILOR900TM.book Page 3 Monday, September 16, 2013 11:01 AM
Summary of Contents for Sailor 900 VSAT
Page 2: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 2 15 04 2013 15 54 39 ...
Page 28: ...List of tables xxvi 98 133966 G1 SAILOR900TM book Page xxvi Monday September 16 2013 11 01 AM ...
Page 257: ...Appendices SAILOR900TM book Page 1 Monday September 16 2013 11 01 AM ...
Page 258: ...SAILOR900TM book Page 2 Monday September 16 2013 11 01 AM ...
Page 355: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 3 15 04 2013 15 54 40 ...