Power up
98-133966-G1
Chapter 5: Connecting power
5-5
5555
Connec
ting power
5.4
Power up
5.4.1
Procedure
1. Connect power to the VMU.
2. Switch on the ACU. The unit starts up and goes through an
initialization procedure:
• ACU POST
• ADU Initializing
• ADU POST
• READY
This may take some time (up to a couple of minutes).
3. The SAILOR 900 VSAT is ready to be calibrated (for first time power
up) or receive data from the VSAT modem (when in normal
operation). The ACU display shows the following message:
The LEDs
Power
and
Fail/Pass
are
steady green
, the LED Logon is
off. For further information on status indicators see
Make sure there are no hardware failures or error codes present,
check the display of the ACU for events. For more information on
error codes and events see
4. Continue to get the SAILOR 900 VSAT system operational, do the
following:
• Make a cable loss and an azimuth calibration.
• Create VSAT modem profiles.
• Create one or more satellite profiles.
For step-by-step instructions, see
Introduction to the built-in web
For installation check lists see,
Figure 5-3: ACU display after first power on (example with LAN ports 1 and 4 used)
Steady
green
SAILOR900TM.book Page 5 Monday, September 16, 2013 11:01 AM
Summary of Contents for Sailor 900 VSAT
Page 2: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 2 15 04 2013 15 54 39 ...
Page 28: ...List of tables xxvi 98 133966 G1 SAILOR900TM book Page xxvi Monday September 16 2013 11 01 AM ...
Page 257: ...Appendices SAILOR900TM book Page 1 Monday September 16 2013 11 01 AM ...
Page 258: ...SAILOR900TM book Page 2 Monday September 16 2013 11 01 AM ...
Page 355: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 3 15 04 2013 15 54 40 ...